Hard Top Frame Design: Part 15 – Taco Marine Project Boat on Ship Shape TV.

In Part 14 we discussed the boat’s hard top had close to a hundred holes that needed to be filled. We filled the holes in the top by drilling larger counter sink holes and filled them with an epoxy resin mixed with milled fibers. With so many holes needing to being fixed, we asked ourselves, “Do we completely rebuild the top or engineer a completely new top?”  We concluded it would be best for maintaining the quality integrity of the Project Boat, to produce a brand new top – so off to the computer we went. Here is a preview of engineering a new top for the Taco Marine Project boat in a Cad Cam system before it goes into the building phase. Imagery and information collected while on site at Vectorworks in Titusville Florida.

 

 

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s